London Climate Hire was fast to respond to a temporary boiler request for a hotel in Hertfordshire. The hotel’s boiler had packed in, which meant no hot water for any of the 60 rooms.
LCH Delivered , Installed and Commissioned The Boiler Within 8 hours.
Thank you LCH 🙂
![Hotel Boiler Hire Hertfordshire 8 LCH Logo 72dpi](https://londonclimatehire.co.uk/wp-content/uploads/2016/04/LCH-Logo-72dpi.png)