We have merged both plant rooms introducing 2.4 megawatts to assist with district heating system serving 6 tower blocks.
We have worked closely with our subcontractor and installed rigid pipework to F/R stabbings along with isolation valve upgrade to mechanical valves.
Keeping all works under one umbrella enabled a smooth transition and a comfortable process on install and commissioning. Overall we have achieved maximum duty with a minimal footprint as each boiler is only 1.5 meters (W) X 5 meters (L) whilst adding fan dilution in the process.