LCH were called out on Saturday to a boiler plant room that had been completely flooded due to pipework failure cold water mains pipework failure, leaving 2 large blocks of flats without heating and hot water.
As soon as the water was pumped out of the plant room , we immediately got to work installing stabbings onto the system. Running flanged flexible F&R pipework.
Going above and beyond for our clients
- We also tapped onto the main gas supply and ran rigid stainless steel and flexible 4” braided gas pipework .
- Complete turnkey.
- During which transport was organised and on route .
- Within 24 hours a 2.4 megawatt boiler plant room was positioned, installed and commissioned restoring heating and hot water services to both estates. Not bad for a weekend.