Emergency temp boiler plant

LCH delivered yet another temp boiler to our customer in North London and restored services within hours of the call. With a requirement of 300kw, we selected our 375kw condensing modular boiler plant room using 3 X 125kw boilers leaving our customer with 125kw of spare duty as back up in the unlikely event of failure.

Our set up within is cascade so that our boilers can switch on and off on temp with master and slave set up along with running time operation. Our condensing boilers are the most efficient boiler plant rooms in the hire industry capable of heating and hot water simultaneously A state of the art packaged plant room fully specked with remote flow monitoring, boiler temperature monitoring and alarm set up.

Complete with unbeatable service from our team we feel that there is no apple to apple comparison in this industry. We are available 247 365 so please contact us as a planned project or as disaster recovery inquiry

LCH Logo 72dpi
Contact With Us For All Your Temporary Boiler Hire Solutions.